Saturday, September 25, 2010

Bathroom Remodel - Unexpected Plumbing & Hardiebacker

Well things sometimes don't go as you expect them to when remodeling. Turns out when we decided to leave the old shower fixtures in place we didn't account for the fact that the new tub is wider than the old one. Consequently they were off-center.

Since I had to redo it all anyway, and we already had the new valve body, I just went ahead and installed it. I'm sure a good plumber wouldn't have taken as long as me (4 1/2 hours!) but in the end it all works (no leaks and hot is hot and cold is cold) and I'm pretty proud of myself. I took my time and was careful.

That was actually all done last weekend.

Today I added the last of the Hardiebacker in the shower area. This time instead of scoring the board with a knife and having a hell of a time getting it to snap cleanly, I put the concrete blade on the circular saw. Man the dust that kicked up! It was raining so I did it in the garage. Probably not the best idea. I had to wash both cars afterwards!

While I had the saw out and setup I also cut the Hardiebacker for the fireplace. It really helps define how it'll look later. I'm also really happy with the height.