We've been finishing up the demo this last week. It's been a slow go. Mostly just because we are not in a rush, so we'd do a much as we wanted and then just quit for the day.
We did get the drywall all up though. Started mudding. I hate that part. Ugh. From the pictures you can see I still need to put up the corner beads.
You can also really see how big of a space we've gained. We're going to fill it full of cabinets.
We also got the tub out finally. I had to smash it to bits with a sledge-hammer. That was a mess. After inspecting the tub/shower plumbing we've decided to leave it be and just buy a new cover/handle for it. Two reasons: One, the work involved with changing the plumbing was going to be a lot because of how the house was built. Two, this is a lot cheaper. The set with bought for the bathroom wasn't terribly expensive, but it was overkill for the room.
So we have to finish the drywall, then it's tub time. We have to have the floor vent moved still too. That'll have to be done soon. We can't do the floors until that is complete.
No comments:
Post a Comment