Kitchen Remodel - Day 1



My Uncle Henry came over and lent me his back and his muscles tearing out the old kitchen. It was more work than you'd expect, but the worst was the floor. Since we are doing tile we needed to get down to the sub floor. Well they had glued and nailed (a lot of nails) 1/4 inch sheets of board down. It was a serious pain to rip it all up.



So after day one, all the dishes and food are on shelves in the den (to the left of this picture) along with the appliances. That refrigerator was a lot heavier than some I've had the displeasure of moving.



Jimmy Johns for lunch and Arbys for dinner.