Day 9 is done. Another long day but we got a lot done. The rest of the drywall went up and the concrete board for the tile went up around the tub. That was a lot of work. Those boards are heavy.
Though the pictures don't show it, we got the first coat of drywall mud up too.
Tomorrow is tile day!
Saturday, May 03, 2008
Bathroom Remodel - Day 9
Thursday, May 01, 2008
BathroomRemodel - Day 7
I didn't get as much done tonight as I'd have liked. In part because I was having tool problems but mostly because my patients was low. Maybe because of the stupid tools.
The tub is secured properly and the tar paper all up and sealed in around the tub. This should keep it nice and water tight in the unlikely event that water gets behind the tile and backer board.
The sheet rock is a mold/mildew resistant kind. I was familiar with it being called 'greenboard' but this clearly isn't green. Maybe it's a brand thing. I dunno.
Tomorrow...no work. I'm going to go see IronMan with a buddy from work.
Wednesday, April 30, 2008
Bathroom Remodel - Day 6
There was a lot of measuring, double measuring and triple measuring to make sure it was properly centered and placed right.
I forgot to solder/sweat one of the joints and water went every where. That was a pain but it's all fixed and holding water pressure now. I hope I placed it right. I followed the instructions...but, I still worry.
Tuesday, April 29, 2008
Bathroom Remodel - Day5
Lots going on today. I took the day off because Home Depot and the plumber were coming today.
Home Depot dropped off all the materials we ordered on Sunday around 9am.
What was done today:
- Outlets set and wired up.
- Outside wall studs that were all eaten up were replaced.
- Outside wall was reinsulated and covered with tar paper.
- Applied tar paper and plywood to the subfloor.
- Adjusted the recessed mirror opening
- The plumber replaced all the old cast iron drains
- Finally we set the new tub.
Unfortunately in the midst of all that I managed to strain my wrist. I hope it's better by tomorrow night. I have dry wall and concrete board to put up!
Monday, April 28, 2008
Bathroom Remodel - Day 4
Sunday, April 27, 2008
Bathroom Remodel - Day 3
Day 3.
The tub, toilet, closet and floor are all gone now. I was hoping to get the little bit of electrical there is done but I'm pooped. That'll have to wait for tomorrow.
Saturday, April 26, 2008
Bathroom Remodel - The Start: Demo
Well we started it.
Last night we started ripping out the old tile and that continued this morning. There is still a bit more to rip up, like the floor, but we are getting close to where we can start rebuilding.

Unfortunately we found an old termite infestation. They didn't do anything that compromises the integrity of the house but we'll be replacing a few 2x4s. Ah the fun that you discover when remodeling an old home.

This afternoon we went to Home Depot and bought what we hope is a majority of the supplies. Tuesday it should be delivered. That should be the day we have the plumbing taken care of too.