Monday, October 11, 2010
Bathroom Remodel - More Drywall
Tuesday, September 07, 2010
Bathroom Remodel - Day 10
Tuesday, August 31, 2010
Bathroom Remodel - Day 3 - A new space
Saturday, August 28, 2010
Bathroom Remodel - Day 2 - More Fireplace Demo

Friday, August 27, 2010
Bathroom Remodel - Day 1 - Fireplace Demo
Bathroom Remodel - Materials Delivery
Thursday, August 26, 2010
Bathroom Remodel - The Before
The bathroom floor is one of the reasons, though there are many, for the remodel. The tile are actually kind of cool but they are badly grouted (obvious repairs over the years), there are broken tiles and I fear the sub floor is damaged by the tub.
New fireplace
Thursday, August 12, 2010
Bathroom Remodel Status
- We are not moving the wall between the two bathrooms. After additional thought we realized we'd be creating a lot of cost and little return. Leaving the wall also allows use to leave much of the plumbing alone, that's a major cost saver. Additionally it allows us to remodel the main (guest) bathroom without permits, as it is all cosmetic.
Additionally we only have to have one bathroom torn apart at a time. We have a third bathroom in the basement, but neither of us wanted to go through that. With only one bathroom down at a time, we can take our time and not feel like we have to rush because of the inconvenience. - We are doing the guest bathroom first. Since the remodel will be mostly cosmetic, except around the tub, the cost to remodel this bathroom first will be low. We should be able to do it for around $3000 or so.
- Rethinking materials. We want the bathrooms to be nice, but watching the DIY Channel has perhaps given us too many great ideas. Many of the bathroom remodels there are $10K+ and we just aren't willing to pay that much. The house cannot really support a bathroom that nice either. We put too much into this house and we'll never see the return, or we'll have to stay in it so long that the bathroom will have to be remodeled again before we sell it.
That's not to suggest we are going cheap either. We are simply being frugal. For example I designed the guest bathroom tub surround with a nice metal accent tile strip. That metal tile goes for about $20/sq ft. We decided that metal tile was probably a bit much for the guest bath. We found some nice glass accept tiles that run about $10/Sq ft. We saved 50% by being flexible and considering the market our house falls into, plus the fact that in the guest bath, who's really going to get to see those nice expensive tiles?
Another area of cost savings was to reconsider the 'bronze' colored fixtures. They look nice, but are more expensive than the simple and classic chrome. Will the bronze look dated later too? If we were ever to sell I don't think a potential buyer is going to walk away because we used chrome fixtures, so long as they are quality (and functioning of course). - We are doing this out of pocket, for the most part. Originally, when we were going to do both bathrooms at the same time, we were going to look at a home equity loan and take care of everything easily. Now we've decided rather than take on that kind of debt, we're going to do as much out of pocket as possible. We already bought our floor tiles awhile back. We are going to take advantage of a nice 0% interest deal that Home Depot is running this weekend though. We'll be able to pay that off before it's due, so it's a lot more affordable than the HEL, though certainly not as flexible, though we OK with that.
Tuesday, September 15, 2009
Non-Profit Business Idea
Every time I drive around Lincoln I see some great old houses that are run down and think, how great would it be to fix those up. Flipping houses was profitable for those who knew what they were doing before the real estate bubble and economy, as a whole, popped.
Tuesday, March 31, 2009
Tile Patterns
#1 - This is our first choice. We have 12" and 6" tiles for this pattern. The concern is that it'll be too busy.
#2 - Simple but a good look.
#3 - Simplest look. It works but it's kinda boring. It IS a classic look though.

I'd love to hear comments.
Monday, March 30, 2009
Kitchen Remodel - Day 2
Day two started with floors. My childhood best friend came over to help early and we put in the 1/4" WonderBoard floor. This took longer than expected. There were a lot of screws to put in. We ran out of board and screws with only a small piece left to fill. Still need to get to the store and get more. Maybe at lunch today.
Once we got the floor in we started bringing up the wall cabinets. We put 2x4s up on the wall to help us hold the cabinets in place. We are putting up a tile back splash later so the holes were not an issue. The first cabinet, in the corner, is the most critical and we had a little trouble getting it right but we did eventually. Dean had to run out for a bit but another mutual friend of ours, Chad, came over and gave me a hand too. We got more of the wall cabinets up and before long Dean was back. It was slower going than expected. Cutting holes for the microwave and making sure all the cabinets lined up right takes time. They started going up quicker though. Once you get that corner right things line up nicely. Then it was just clamp, drill, counter sink and screw together.
After a bit Chad had to go. Before he did he helped Dean and I move the pantry in (2x2x8). It was a beast but it's going to be really nice. We also got the corner base cabinet in. That was tricky. The door was barely large enough.
Dean and I really were only able to get the corner and the sink base in before he needed to head home. That sink base was a pain. Making sure all the holes lined up right with the plumbing was difficult. The worst part was that the water shut-offs come UP from below, not out of the back, so getting the cabinet in while getting the pipes in the right holes was a trick. I ended up having to cut bigger holes than I really wanted to, but it was either that or do some plumbing, which I really didn't want to do. Been there done that. That would have taken a couple hours easily for minimal gain.
Melody and I got one more small base cabinet in before cleaning up. That was a 10 hour day and I was pooped! I wanted to have all the cabinets in but no dice. I need to rent a table saw too so I can rip some spacers for a couple of spots. Maybe that'll be day 3.
Lunch: Godfathers Pizza. Dinner: Cold Godfathers Pizza. (I don't have the microwave up yet.)
Kitchen Remodel - Day 1
My Uncle Henry came over and lent me his back and his muscles tearing out the old kitchen. It was more work than you'd expect, but the worst was the floor. Since we are doing tile we needed to get down to the sub floor. Well they had glued and nailed (a lot of nails) 1/4 inch sheets of board down. It was a serious pain to rip it all up.
So after day one, all the dishes and food are on shelves in the den (to the left of this picture) along with the appliances. That refrigerator was a lot heavier than some I've had the displeasure of moving.
Jimmy Johns for lunch and Arbys for dinner.
Sunday, February 15, 2009
So it begins...
- New carpets in the basement. One room only had linoleum and that wasn't going to work. The other room, well, I'll explain that in #2.
- Opening up the main basement room. There are two large rooms in the basement. One is going to become a bedroom, the other is going to be my theater room. However it was apparently a bedroom in the past, with a closet and door. Since neither are really right for a living space we started taking them out. There will be some drywall repairs needed but the end result will leave the room feeling larger and more open. This needs to be effectively complete by Wednesday. That's when the new carpets are going to be installed.
The carpets need to be installed this week so we have some place to move stuff. Why not upstairs? That's #3. - New hardwood floors through out the entire upstairs (minus the kitchen). We are having bamboo floors installed through the entire upstairs. We elected to do the carpet removal ourselves. I'll have to get jumping on that after #2, but I think that'll be ok as we have a couple weeks before the floors can be installed.
- Last but not least is the kitchen. It's not as significant of a remodel as our last kitchen but it's still pretty big. Luckly the cabnets are perbuilt this time so I won't have to spend so much time building them first. Even the doors are prehung so they should go up pretty fast. We'll be tiling the floor. The bamboo seemed a bit too soft for a room where metal objects could potentially fall.
The master bedroom was a bit more work. We had to remove all the base board (for the bamboo floor) and reove the carpet, carpet pad, tack strips and staples. It was actually easier than expected.
Finally, in addition to all the painting, we started removing the closet from the basement 'den'. That was nearly completely removed when we left for the night. I still have about a 4 foot wall section to remove (don't worry it's not load bearing) and I have to relocate the light switch. That is for tomorrow.
I have tomorrow off so I'll finish opening up the room and then get the drywall and mudding going. Wall patching will go easy enough, but the 'pop corn' ceiling will be a pain to repair. I need to do some homework on that. Then I should be able to pull that old carpet and prep the room for the new carpet. I probably won't get to paint, as the drywall mud always seems to take forever to dry and of course there is the sanding, however, I'll probably pick up some paint. I saw some returned paint that might work in there. If any of the colors work, then I'll be set. If not, meh, paint is cheap.
I'll try to remember to take pictures tomorrow.
Monday, January 26, 2009
New Kitchen
One change already has come to be. The floor. We are doing caramelized bamboo floor through much of the house but after doing some testing with a sample piece of flooring we decided it was too soft for the kitchen. I dropped my keys on the sample from about 4 feet up and it dented the flooring pretty badly. Last thing we need is to drop a can of soup on the floor and have a ring stamped on our floor. So we'll look at tile.Everything else should be about right. A warm putty color on the walls, spice colored maple cabinets, nice rich brown laminate counters, and neutral tile back splash with bit of brown glass in the accent tiles.
We elected for laminate counters because our neighborhood is nice but not that nice and honestly we don't care for the hardness of granite. We'll have a bullnose edge on the counters so it'll have an appearance of stone without the cost.
Though not pictured I think we are going to go with bronze fixtures, knobs and pulls for our metal finish. It should go well with the other browns and warm tones we are working with.
I'm not excited about the construction but the end result will be nice and it'll be done early so we won't have to worry about dealing with it later.
Sunday, September 21, 2008
Gables Part Deux
The first picture was pretty early this morning, maybe 9am. Just got done tearing off the old wood, scraped some old peeling paint and got the tar paper up.
This next picture is after all the siding is up and ready for paint. I had to give the caulking time to dry so I did some other touch-up painting around the exterior of the house.
Done finally. The results are nice. It's not as 'perfect' as I would like but it's good. Certainly good enough for prepping for sale. The new owners shouldn't find much to complain about.
Things are getting close! Nearly done with all the work before putting her on the market.
Saturday, September 20, 2008
Gables are a pain to replace
As you can see from the picture below, the drive way was pretty dirty. I'll need to finish it up in the next few days.
However, the priority was working on the gables because they take much longer than I have time in the evenings after work.
This pile is all the old wood that was replaced. If you look carefully you might see some of the wood rot. It was primarily due to water damage rather than insects. Though, I did find, to my delight, a wasp (Polistinae)nest while removing the wood. They were not happy that I found their home but surprisingly they were not aggressive. I got the bug spray and went to town. A few flew off to return later, but they were quickly disappointed to find that they could no longer get to their home and
These last two pictures are when I was putting up the tar paper and finally being done with the main gable. I still need to do the small one over the porch. Hopefully that'll go much faster.
Saturday, April 26, 2008
Bathroom Remodel - The Start: Demo
Well we started it.
Last night we started ripping out the old tile and that continued this morning. There is still a bit more to rip up, like the floor, but we are getting close to where we can start rebuilding.

Unfortunately we found an old termite infestation. They didn't do anything that compromises the integrity of the house but we'll be replacing a few 2x4s. Ah the fun that you discover when remodeling an old home.

This afternoon we went to Home Depot and bought what we hope is a majority of the supplies. Tuesday it should be delivered. That should be the day we have the plumbing taken care of too.